LB

September 7th, 2011 at 9:09 AM ^

They wouldn't let us inside the arena from the concourse, but the doors were all wide open. What an amazing difference. It easily falls somewhere between wow and spectacular.

Raoul

September 7th, 2011 at 9:12 AM ^

There's also a video report at mgoblue.com that can be found here.

And here are a couple other photos that were posted at the Michigan Basketball Facebook page:

Raoul

September 7th, 2011 at 9:44 AM ^

  • The flooring and walls in the bowls were all repainted
  • Handrails were installed in the aisles and I believe the aisles were widened
  • The seats themselves have all been replaced and now have cup holders
  • All the seats are blue
  • Seating for people with disabilities was expanded
  • New tunnel connects to the Player Development Center

It should be noted that this is just the first phase of the Crisler renovation. The concourse will be overhauled in the next phase.

superstringer

September 7th, 2011 at 9:37 AM ^

Uhhh... isn't the scoreboard TOO LOW????

If someone wanted to throw a baseball, sideline-to-sideline pass -- won't it bounce off the scoreboard?  It looks just incredibly low.

Are there NCAA or USA Basketball rules about that sort of thing?

mmp

September 7th, 2011 at 9:57 AM ^

I was at a talk given by DB a few weeks ago and he mentioned that the Crisler scoreboard wouldn't be completed until October I believe, so they may still be working on it and will put it in its final position later.  

might and main

September 7th, 2011 at 11:00 AM ^

Not sure if I'm looking at this right, but it looks like the maize rage bleachers have been moved to the west side?  If so, I hope the TV cameras will be moved to the east side?  It's great to have the Rage in the background as the ball moves up/down the court ... maybe they'll still show up OK with the new configuration, but I'm not sure???

Raoul

September 7th, 2011 at 9:02 PM ^

Yes, there are retractable bleachers on the left side, which have been, well, retracted.

The benches and scorer's table will be on the right side. As I posted above, everything is/will be flipped. That picture above is taken from the end that has the old tunnel. So in the previous configuration, the benches and scorer's table were on the left side.